IMG_3013 IMG_4022 IMG_4047 IMG_4074 IMG_4093 IMG_4103 IMG_4196 IMG_4207

THE STATE BEFORE THE INTERVENTION
The building was abandoned a few years ago. Because of the degradation of the rooftop, the water infiltrated and affected the original laths.

SAFETY INTERVENTION PROPOSAL
The proposal is to repair the roof by replacing the elements which suffered water infiltration, replacing the missing tiles and drainpipes and preventing further leakages by closing the holes.

ACCOMPLISHED INTERVENTIONS
The whole historical tile roof was inspected by hand and the missing or degraded tiles were replaced with identical ones. The ridges were fixed with metal nails. A small number of degraded laths were replaced with new ones.